Refer to the exhibit.
A network administrator assumes a task to complete the connectivity between PC A and the File Server.
Switch A and Switch B have been partially configured with VLANs 10, 11, 12, and 13
What is the next step in the configuration?
Click on the arrows to vote for the correct answer
A. B. C. D.B.