DRAG DROP - The IaC configuration for an application is being deployed using a CI/CD pipeline.

Drag and drop the steps for this pipeline from the left into the correct order that they would be executed on the right.

Not all options are used.

Select and Place:

Answer Area

Integration test of the most recent configurations is

performed. step 1

The Cl tool is notified of an update. step 2

The code repository is updated by a user. step 3
The pipeline notifies the repository to run tests step 4

The configuration changes are pushed to devices.

Explanations

Answer Area

Integration test of the most recent configurations is
performed

The code repository is updated by a user.

The Cl tool is notified of an update

The Cl tool is notified of an update

The code repository is updated by a user.

The pipeline notifies the repository to run tests

The pipeline notifies the repository to run tests

The configuration changes are pushed to devices.

The configuration changes are pushed to devices.