Refer to the exhibit.
An operations engineer observed a suboptimal routing between R4 and R5
The engineer decided to apply a route leaking on R2 and R3 into 49.2000 area ID.
Yet, the traffic flow between R4 and R5 is not via the shortest path R4---R3----R1----R5(metric 24)
Which reason for this behavior is true?
Click on the arrows to vote for the correct answer
A. B. C. D.B.