A certain rack mounted blade server chassis needs 3-phase power for operation.
There is currently only single-phase power coming into the room.
The administrator needs to:
Click on the arrows to vote for the correct answer
A. B. C. D.C.
Option A: Calling an electrician to wire single-phase power into 3-phase power might be a solution, but it would involve significant modifications to the electrical system and may not be feasible or cost-effective.
Option B: Using a single-phase UPS to power a 3-phase server is not a practical solution because it would require significant modifications to the electrical system, which would increase complexity, cost, and maintenance requirements. Additionally, the UPS may not be able to supply enough power to run the server effectively.
Option C: The best solution would be to call an electrician to see if 3-phase power can be brought into the room. The electrician will be able to evaluate the electrical system and determine the feasibility and cost of bringing 3-phase power into the room. This would involve upgrading the electrical infrastructure and could potentially be costly.
Option D: Using an adapter to configure the server to use single-phase power would not be a viable solution because a server that requires 3-phase power cannot be run on single-phase power. The adapter may cause damage to the server, and the server would not operate as intended.
Therefore, the correct answer is C, calling an electrician to see if 3-phase power can be brought into the room.