You are advising a school district on disaster recovery plans.
In case a disaster affects the main IT centers for the district they will need to be able to work from an alternate location.
However, budget is an issue.
Which of the following is most appropriate for this client?
Click on the arrows to vote for the correct answer
A. B. C. D.B.
When it comes to disaster recovery, there are four main options: cold site, warm site, hot site, and off-site. Each option provides different levels of availability and costs. The most appropriate option for this school district, given their budget constraints, would be a warm site.
A warm site is a disaster recovery location that is partially equipped with IT infrastructure but not fully operational. It is usually less expensive than a hot site but more expensive than a cold site. In a warm site, the hardware, software, and network infrastructure are in place, but they are not fully configured or loaded with the necessary data.
In the event of a disaster, the school district would need to quickly transfer their critical applications and data to the warm site to resume their IT operations. This process may take a few days, but it is still faster and more cost-effective than setting up a hot site from scratch.
A cold site, on the other hand, is a disaster recovery location that is completely empty and lacks IT infrastructure. It is the least expensive option, but it can take several weeks to set up and configure the necessary hardware and software.
An off-site location is any location outside the main IT center, including a warm or hot site, where backup data and equipment are stored. Off-site backup provides an added level of security in case of a disaster, but it does not offer immediate IT infrastructure availability.
A hot site is a fully equipped and operational disaster recovery location that is ready to use at a moment's notice. This option provides the highest level of availability, but it is also the most expensive.
In summary, given the budget constraints of the school district, a warm site would be the most appropriate option for their disaster recovery plan.