A multinational corporation needs to migrate servers, which are supporting a national defense project, to a new datacenter.
The data in question is approximately 20GB in size.
The engineer on the project is considering datacenters in several countries as possible destinations.
All sites in consideration are on a high-speed MPLS network (10Gb+ connections)
Which of the following environmental constraints is MOST likely to rule out a possible site as an option?
Click on the arrows to vote for the correct answer
A. B. C. D.B.
Based on the scenario, the multinational corporation needs to migrate servers supporting a national defense project to a new data center, and the data in question is 20GB in size. The engineer is considering several data centers in different countries, all of which are connected by a high-speed MPLS network with 10GB+ connections.
The question asks about the environmental constraint that is MOST likely to rule out a possible site as an option. Let's review each option:
A. Downtime impact: This refers to the amount of time the servers will be offline during the migration process. If the downtime impact is significant, it could affect the organization's operations and lead to financial losses. While downtime impact is an important consideration, it is not likely to rule out a data center as an option since downtime can be minimized with proper planning and execution.
B. Legal restrictions: Different countries may have different legal requirements that could restrict the corporation from migrating sensitive data to certain data centers. For example, data privacy laws could limit the corporation's ability to store data in a particular country. Legal restrictions could be a significant factor in ruling out a data center as an option.
C. Peak time frames: This refers to the period when the data center experiences high traffic and utilization. If the migration occurs during peak time frames, it could affect the performance of the servers and the overall network. However, with proper planning and scheduling, the migration can be done during off-peak hours to minimize disruptions. Peak time frames are important to consider, but they are unlikely to rule out a data center as an option.
D. Bandwidth: This refers to the amount of data that can be transferred over the network in a given time. If the bandwidth is limited, it could significantly impact the migration process, leading to longer transfer times and potential data loss. Given that the data in question is 20GB in size, bandwidth is a critical consideration in ensuring a smooth migration. If the data center has insufficient bandwidth, it could be ruled out as an option.
In conclusion, based on the given scenario, the environmental constraint MOST likely to rule out a possible site as an option is bandwidth (Option D).