A project team is overseeing the installation of a new reptile habitat at the local zoo.
During execution, zoo personnel decides to house a different type of reptile that will require a different temperature range than the capacity of the installed system.
The modification has been approved.
Which of the following constraints are MOST likely to be affected? (Choose two.)
Click on the arrows to vote for the correct answer
A. B. C. D. E.CD.
293
The situation presented in the question indicates that there has been a change in the requirements of the project due to the need to install a different type of reptile habitat that requires a different temperature range. This change has been approved, and now the project team needs to consider which constraints are most likely to be affected.
A. Quality: This option is a possibility, as the existing system may no longer meet the requirements for the new type of reptile. However, it is not the most likely constraint to be affected since quality refers to the overall fitness for use of the final product, and it may still be possible to achieve the required quality level with the modified system.
B. Requirements: This option is the most likely constraint to be affected, as the change in the type of reptile and the associated temperature requirements represent a change to the project's initial scope. The project team will need to review and update the project requirements to ensure that they are still aligned with the new scope.
C. Cost: This option may be affected if replacing the existing system incurs additional expenses. However, it is not the most likely constraint to be affected, as it will depend on the extent of the modifications needed to the existing system.
D. Schedule: This option is likely to be affected since the modification was an unscheduled task and may impact the project timeline. The project team will need to assess the impact of the change on the project schedule and make necessary adjustments.
E. Stakeholders: This option may be affected since stakeholders will need to understand the modification and provide buy-in. However, it is not the most likely constraint to be affected, as the change is relatively minor and should not require significant changes in stakeholder communication or engagement.
In conclusion, the two most likely constraints to be affected by the modification to the reptile habitat installation project are the requirements and the schedule. The project team will need to review and update the project requirements to ensure that they are still aligned with the new scope and assess the impact of the change on the project schedule and make necessary adjustments.