Which of the following is false?
Click on the arrows to vote for the correct answer
A. B. C. D.C
You should always use the NPV criterion for selecting projects. The IRR method can give project rankings different from the NPV criterion depending on the type of cash flows of the project as well as the cost of capital involved. Further, a project with a higher NPV at the project's cost of capital can have a lower IRR than another project with lower NPV. Therefore, (III) is false.