You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Click on the arrows to vote for the correct answer
A. B. C. D. E.BDE.
https://technologyblog.rsmus.com/microsoft-dynamics/dynamics-365-for-finance-and-operations/rework-batch-orders-in-microsoft-dynamics-365-for-finance-and-To rework the batch of cold brew coffee, the following three actions are required on the rework order:
B. Add 20 grams of sugar to the production formula: The first step is to modify the production formula of the coffee to include the additional sugar. This can be achieved by adding 20 grams of sugar to the existing production formula for the CB-0001 item. Adding the sugar to the formula will ensure that the correct amount of sugar is added to the reworked batch.
E. Add a route operation for 0.5 run time hours of stirring: The second step is to add a new route operation for stirring the reworked batch for an additional 0.5 hours. This will ensure that the sugar is mixed thoroughly into the reworked batch. This can be achieved by adding a new route operation for stirring with a run time of 0.5 hours to the existing production route.
D. Manually reserve batch 120008 after estimating the batch order: The third step is to reserve the batch of coffee that needs to be reworked. This can be achieved by manually reserving batch 120008 after estimating the batch order. This will ensure that the correct batch is identified and reworked without affecting other batches in production.
Therefore, the correct answers are B, E, and D.
Option A (delete all items from the production formula except for 20 grams of sugar) is incorrect because it would remove all other necessary ingredients from the production formula, which could result in an incorrect product.
Option C (delete all route operations except for a half an hour stirring operation) is incorrect because it would remove other necessary route operations, such as brewing, filtering, and packaging, which could result in an incorrect product.